Overview
- Updated On:
- 31/03/2026
- 1,200.00 ft2
Property Description
Looking for Villa Plots in Hoskote? Here comes a giant development of BCD City Plots close to Whitefield, Bangalore East. EOI Submission is going on an Early Bird Offer at one of the most demanding 70 Acres Integrated Township. BCD City Township is situated in NIsarga Layout, Hoskote Town close to STRR Bangalore. Hoskote is also called Hosa-Bengaluru in the real estate Bangalore industry due to its very demanding and promising for home buyers as well as investors. This villa plotted Development offers multiple dimensions at a very attractive price as never before offered. In the last 5 years of time, lots of new launch was witnessed as Whitefield Extension options for home buyers who have workspaces in;
- ITPL & EPIP Zone
- Whitefield
- KR Puram
- Mahadevapura
- Manyata Tech Park
- Kadugodi
- Old Madras Road
Many Cat A developers have entered this most sought locality as new real estate destinations like;
- Godrej Properties
- Prestige Group
- JP Group
- Ruchira Projects
- BCD India
- Brigade Group
- Konig Homes
- Aamba City – Plotted Development in Hoskote
Configurations – BCD City Plots Hoskote
| 1200sft Plots | 30×40 Dimensions |
| 1500sft Plots | 30×50 Dimensions |
| 1750sft Plots | 35×50 Dimensions |
| 1800sft Plots | 30×60 Dimensions |
| 2000sft Plots | 40×50 Dimensions |
| 2400sft Plots | 40×60 Dimensions |
Specifications
General
Civil Structure at BCD City Plots
- Seismic II zone / IS – 1893 compliant
- RCC framed structure with concrete brick walls
Doors
- Engineered wooden doors
MAIN DOOR
- Engineered wooden doors with a veneer finish.
INTERNAL & TOILET DOORS
- Engineered wooden doors with laminate finish.
Windows
- 3 track UPVC windows with mosquito mesh.-Living Room: 3 track UPVC sliding doors with mosquito mesh.
Flooring And Wall Cladding
- Glazed vitrified tiles or equivalent flooring.
LIVING, DINING, AND KITCHEN
- Glazed Vitrified tiles
Paint
- INTERNAL WALLS: Emulsion/Mineral Paint
- EXTERNAL WALLS: Combination of textured finish & external grade paint as per architect’s scheme
PERGOLA
- Enamel painting for MS work in BCD City Plots
CEILING
- Emulsion/Mineral paint
PLUMBING, ELECTRICAL & SERVICES
- Cp, Sanitary Fittings & accessories: wall-hung EWC commode with flush valve
- Wall-hung/Over counter-wash basins (wherever applicable)
- Chrome-plated hot & cold wall mixer with hand shower, pillar cock, health faucet, etc.
- Dual plumbed: The building with two sets of pipes, one for fresh water and one for recycled water
- Concealed master control cock in all bathrooms.
Safety And Security
- Compound wall around the housing complex
- 24/7 365 security at entry/exit & other vantage points at BCD City Plots
- CCTV camera at entry/exit, children’s play area & other vantage points
Green Features Water Conservation
- Dual Piping system & dual flush system for sanitary.
- All landscapes are maintained through recycled water.
- Water efficient fixtures
- Rainwater harvesting
- Groundwater recharge
Energy Conservation
- Solar-heated water provision for all bathrooms.
- Energy-efficient lights in common areas.
- Timer adjusted street lights.
Solid Waste Management
- Segregation at source Organic waste converter room.
Water Management
- Water metering at BCD City Plots
BEDROOMS
- The ground floor Bedroom & master bedroom is of laminated wooden flooring, kids & guest bedroom Is of vitrified tiles
BATHROOMS
- Floor: Slip-resistant Vitrified tiles
- Walls: Vitrified tiles
BALCONY
- Wooden finish ceramic tiles
STAIRCASE FLOORING (INTERNAL)
- Granite flooring
Internal Railings
- BALCONY: SS railing with toughened glass panels.
- STAIRCASE (INTERNAL): SS railing with toughened glass panels.
Why BCD City?
One of the best Township Projects in Hoskote Bangalore with multiple options of properties. Several configurations to invest in. Product is the part of one of the most reputed and world-class Construction Companies in India, BCD India Group.
Stay tuned for more options of Township and Plotted Developments apart from BCD City Plots across Bangalore. Take our brokerage-free real estate services from our well-trained sales team.
- Principal and Interest
- Property Tax
- HOA fee






